Over the course of our existence we have interconnected hundreds of kilometres of pipelines forming an energy transmission network across the landscape. Our infrastructure delivers energy where it is needed. We are the architects of a dynamic environment in which every route is individually designed and constructed to meet our clients’ needs.
Milestones
1990
business founded by Mojmír Homola
2003
change of legal status; HOMOLA a.s. joint-stock company
2012
company relocated from Ostrava-Krásné Pole to the Industrial Centre complex in Ostrava-Kunčičky
2017
commencement of pressure testing operations on high-pressure gas pipelines
2018
introduction of the Resitherm electrical pre-heating system to the Czech market
2019
commencement of stress testing operations on high-pressure gas pipelines
2023
generational ownership transfer; Ing. Michal Homola becomes the new owner of HOMOLA a.s.; launch of mobile high-pressure gas transfer technology
2024
launch of high-pressure Primus Line bypass sleeve rental for temporary bypasses; drone mapping of construction sites
2025
offline in-line inspection of gas pipelines – UT, MFL